What should be the maintenance channel reserved behind the LCD splicing screen?

Jun 12, 2021

Leave a message

When installing LCD splicing walls, there must be a maintenance safety channel behind the screen. If the maintenance safety channel is involved, it must be post-maintenance installation, such as server cabinet type and two-layer support frame type. Method, the use of these two methods of installation is likely to be due to the large total number of LCD splicing walls, such as more than 9 pieces, full consideration of the central part of the display screen in the middle and late stages of easy disassembly and assembly will use this type of installation.



If the LCD splicing wall adopts these two post-installation maintenance methods, you should not only fully consider the actual effect of the current installation. To fully consider the convenience of mid-to-late maintenance and disassembly, it must be embedded behind the server cabinet or support frame. A certain indoor space, the size of this indoor space should ensure that it can be smoothly based on a talented person. Under normal circumstances, everyone suggests that Z should be less than 60 cm. Because of the reserved size, it is more difficult for professional and technical personnel to enter. What's more, there must be a certain indoor space theme activity to facilitate work. In some cases, the customer fully considers the space utilization problems of the front, rear, left, and right, and usually expects the embedded space to be smaller, which is actually not good. Because the small staff is inconvenient to enter, the basic purpose of maintenance will be lost.


Post-maintenance installation is suitable for houses with a large indoor space on the front, rear, left and right, and saves the cost and budget. If all the houses are not large by themselves, post-maintenance installation cannot be applied. In fact, we use electric welding welding support frame to move the bearing point from the wall to support the roof and road surface of the house, and install the front maintenance support frame on the vertical beam, Z finally hangs the LCD splicing wall on the front maintenance support frame, so back and forth The left and right indoor space only needs to be 19 cm. If the LCD splicing wall is not very good and must be disassembled, you can immediately push forward to pop up a window and carry out maintenance independently.


Send Inquiry